Napa Napa Refinery Wharf Extension at the western end of Port Moresby Harbour PNG. This involved the construction or modification of 12No precast concrete dolphins on steel tube piles some 40m long, driven to refusal. On completion of the dolphins a walkway system was also constructed with spans of over 30m in length. Construction was completely by floating plant.
Koniambo Wharf located at the Koniambo Nickel Smelter in Northern New Caledonia was a 120m long x 20m wide cast in situ concrete deck on 120mm dia steel piles. Construction was by floating plant with concrete supplied from shore along a temporary bridge. The project also included substantial rock protection works and dredging of the shore batter.
Nambucca Bridge is a 20-span bridge over the Nambucca River NSW and forms part of the Pacific Highway Upgrade in the area.
Otira Viaduct is a 440m long balanced cantilever bridge, forming the new alignment of the West Coast Highway at Arthur’s Pass New Zealand.